Glossary
The terms you’ll come across in the method and its deliverables, explained in one or two sentences.
The method
Section titled “The method”| Term | What it is |
|---|---|
| As-is | How a process or system works today: your starting point. If you start from scratch, the as-is is the need or the idea. |
| To-be | How it should work: the redesigned process or the software you need. Is2Be is the path from as-is to to-be. |
| Phase | Each stage of the method. Is2Be Process has 7 (from identification to monitoring) and Is2Be Software another 7 (from ideation to monitoring). |
| Step | Each concrete task within a phase, which produces a deliverable. There are 64 in total; in coding assistants each step is a command. |
| Phase gate | The point at the end of each phase where the kit stops and a person reviews and approves before moving on. |
| Route | The sequence of steps that applies to your starting point. Not every project uses every step: see Where do I start?. |
| Mode | The type of initiative that sets the route: redesigning a process, creating it from scratch, automating it, modernizing a legacy system, a new module… |
| Evidence-First | The method behind Is2Be Process: no claim about the process without its source. |
| Spec-First | The method behind Is2Be Software: specify and validate before coding. |
| Assumption | Something that hasn’t been checked. The method marks it as such and turns it into a question for people; it’s never presented as a fact. |
| Discrepancy | A contradiction between two sources, for example between what the procedure says and what’s actually done. It’s recorded, not hidden. |
| Traceability | Being able to follow every change back to the problem it solves and the decision behind it, from a sentence in an interview to a software test. |
| Deliverable | The output of a step: a document, a diagram, an analysis, code or tests. |
Processes
Section titled “Processes”| Term | What it is |
|---|---|
| BPM | Business Process Management: the discipline of managing and improving business processes end to end. |
| BPMN | Business Process Model and Notation: the standard for drawing process diagrams that both business and technical people understand. |
| DMN | Decision Model and Notation: the standard for writing decision rules in tables, separate from the process diagram. |
| SIPOC | A one-page view of the process: Suppliers, Inputs, Process, Outputs and Customers. |
| Process charter | The kick-off document: which process is improved, why, with what scope, goals, indicators and risks. |
| Process owner | The person (a role) accountable for the process end to end. |
| RACI | A table that says, for each activity, who does it (Responsible), who answers for it (Accountable), who is consulted (Consulted) and who is kept informed (Informed). |
| Lean | A way of improving focused on customer value and eliminating waste: waiting, rework, unnecessary handoffs… |
| Six Sigma · DMAIC | A data-driven improvement method: define, measure, analyze, improve and control. Its DMADV variant is for designing something new. |
| ECRS | The order for improving an activity: eliminate, combine, rearrange and simplify. Only then, automate. |
| Root cause | The underlying reason for a problem, not its symptom. Fix it and the problem doesn’t come back. |
| Process mining · event log | Analyzing the records systems leave behind (the event log) to see how a process really runs. |
| PDR | Process Decision Record: the record of an important decision about the process, with the alternatives considered and why one was chosen. |
| Gap analysis | The comparison between the current process and the new one (or what a regulation requires): what changes and what must be done to get there. |
| Business case | The case for the change: investment, benefits and return (NPV, IRR, payback). |
| SOP | Standard Operating Procedure: the step-by-step day-to-day procedure for whoever runs the process. |
| APQC PCF | A reference catalog of processes, common to many companies, used to organize and compare processes. |
| COSO | The reference framework for risk and internal control. |
| ADKAR | A model for managing change in people: awareness, desire, knowledge, ability and reinforcement. |
Software
Section titled “Software”| Term | What it is |
|---|---|
| PRD | Product Requirements Document: what needs to be built and why, with its business rules. It’s the software’s starting point. |
| User story | A need told from the user’s point of view (“as a…, I want…, so that…”), with its acceptance criteria. |
| Acceptance criteria | The concrete conditions a feature must meet to be accepted. |
| ADR | Architecture Decision Record: the record of an architecture decision, with the options considered and their consequences. |
| Stack | A project’s set of technologies: language, framework, database, platform. The method assumes none of them. |
| Legacy | An old system still in use. When it’s modernized, its business rules are preserved unless the business decides otherwise. |
| Microservice · micro-frontend | An independent piece of the system, on the server or in the interface, with its own contract, tests and deployment. |
| Code review | Reviewing every code change before merging it, against the quality and security criteria. |
| Unit, integration and end-to-end tests | Automated tests of an isolated piece, of several pieces together and of a complete journey as a user would take it. |
| CI/CD | Continuous integration and delivery: every change is built and tested automatically and deployed with a defined procedure, including rollback. |
| Runbook | The guide for what to do when an incident happens: how to detect it, how to fix it and whom to notify. |
Measurement
Section titled “Measurement”| Term | What it is |
|---|---|
| KPI | Key Performance Indicator: an indicator that measures whether the process works, with its formula, source and target. |
| Baseline | The starting value of an indicator, before the change. Without it, the improvement can’t be proven. |
| Lead time · cycle time | The total time from when a request arrives until it’s completed, and the time actually spent working on it. |