Build or migration plan
Turns the chosen architecture into deliverable, verifiable phases; for modernization, with a transition strategy and parity checks.
Command: /sf:build-migration-plan · Methodology: Is2Be Software · Phase: Phase 2 · Design
When to use it
Section titled “When to use it”Once ADR-001 is decided.
It’s working if
Section titled “It’s working if”- Every phase ends with something demonstrable and objective acceptance criteria.
- The order follows dependencies and risk.
- In modernization, it recommends incremental or big-bang with a justification.
Where it fits
Section titled “Where it fits”- Before: ADR (Architecture Decision Record)
- After: Test plan
Requirements
Section titled “Requirements”-
Your AI connected to the service with your licence key (how to connect).
-
The project set up once with
/sf:setup. -
The outputs of the previous steps (see Where it fits).
Incremental or big-bang?
It depends on risk, size and business continuity. The plan recommends one with its reasoning; the decision goes into an ADR.
Why such small phases?
So each one ends with something demonstrable and verifiable.