To-Be model
The detailed target process: BPMN, activities, RACI, target KPIs, controls and a self-check.
Command: /ef:to-be-model · Methodology: Is2Be Process · Phase: Phase 4 · To-Be design
When to use it
Section titled “When to use it”Once the PDR for the chosen option is accepted.
It’s working if
Section titled “It’s working if”- It implements the chosen option and nothing more; anything else goes to ‘additional proposals’.
- It keeps the As-Is IDs for traceability.
- Every relevant risk has a control or an acceptance in a PDR.
Where it fits
Section titled “Where it fits”- Before: PDR (Process Decision Record)
- After: Gap analysis
Requirements
Section titled “Requirements”-
Your AI connected to the service with your licence key (how to connect).
-
The project set up once with
/ef:setup. -
The outputs of the previous steps (see Where it fits).