Traceability matrix
Links problem → cause → change → decision → KPI → scenario → benefit in a single view.
Command: /ef:traceability-matrix · Methodology: Is2Be Process · Phase: Phase 5 · Validation
When to use it
Section titled “When to use it”At the end of Phase 5, once the scenarios have been run.
It’s working if
Section titled “It’s working if”- No change is left without a justification.
- No prioritized problem is left without an answer (or ruled out in a PDR).
- It’s the evidence presented at the Phase 5 gate.
Where it fits
Section titled “Where it fits”- Before: Validation scenarios
- After: Implementation plan
Requirements
Section titled “Requirements”-
Your AI connected to the service with your licence key (how to connect).
-
The project set up once with
/ef:setup. -
The outputs of the previous steps (see Where it fits).