Skip to content
Is2Be

Gap analysis

Everything that has to change to get from As-Is to To-Be: process, people, systems, data and controls.

Command: /ef:gap-analysis · Methodology: Is2Be Process · Phase: Phase 4 · To-Be design

After the To-Be model.

  • Every gap has effort, dependencies and the problem it solves.
  • It separates quick wins from what needs software.
  • It describes the impact on each role: what they stop doing and start doing.
  • Your AI connected to the service with your licence key (how to connect).

  • The project set up once with /ef:setup.

  • The outputs of the previous steps (see Where it fits).