Technical stories
Technical or non-functional requirements from architecture, testing or DevOps, tracked as stories — never approved by Business.
Command: /sf:technical-stories · Methodology: Is2Be Software · Phase: Phase 2 · Design
When to use it
Section titled “When to use it”After ADR-001, after the test plan and after the CD pipeline — one invocation per each, on the same document.
It’s working if
Section titled “It’s working if”- Each story has a clear Origin and an approver who is not Business.
- No pending rule from the test plan is left without becoming a story.
- No technical story duplicates an existing business User Story.
Where it fits
Section titled “Where it fits”- Before: ADR (Architecture Decision Record), Test plan, CD pipeline
- After: It’s the last step on its path.
Requirements
Section titled “Requirements”-
Your AI connected to the service with your licence key (how to connect).
-
The project set up once with
/sf:setup. -
The outputs of the previous steps (see Where it fits).