Business rules (DMN)
Moves decision logic out of the flow into DMN tables with an owner, completeness checks and test cases.
Command: /ef:dmn-rules · Methodology: Is2Be Process · Phase: Phase 4 · To-Be design
When to use it
Section titled “When to use it”When a process decision has more than 2-3 conditions.
It’s working if
Section titled “It’s working if”- No combination of inputs is left without a rule or matches two at once.
- It doesn’t invent thresholds: anything missing is an assumption.
- Every rule has a test case, plus edge cases.
Where it fits
Section titled “Where it fits”- Before: PDR (Process Decision Record)
- After: To-Be model
Requirements
Section titled “Requirements”-
Your AI connected to the service with your licence key (how to connect).
-
The project set up once with
/ef:setup. -
The outputs of the previous steps (see Where it fits).
Do I need a DMN engine?
No. The tables work just as well as a specification; the engine (or code) is a software decision.
What if a threshold is missing?
It leaves it as an assumption with a question for the rule’s owner. It never invents it.